After discharging FPSO Goliath, the Dockwise Vanguard was moored at the poles in the Caland canal. Dockwise asked ERP Trading BV to reposition the cribbing plan for loading the Armada Intrepid. After the successful loading of the Armada Intrepid, ERP Trading BV was also asked to do the complete seafastening for sail out.