The Dockwise Black Marlin discharged topside modules of the Clair Ridge project in the North Sea. After a successful discharge, the Black Marlin came to Eemshaven port for cleaning. Dockwise Shipping asked ERP Trading BV to clean the Black Marlin. The cleaning contained 1700mT of scrap and 600 meter of gouging. ERP Trading BV did the execution in 4 days (24hrs).

Contact

Office, warehouse and storageyard
Veerweg 65
3341 LR Hendrik-Ido-Ambacht
The Netherlands

E: info@erp-trading.com
T: +31 (0) 180 464 246

ERP Trading BV

VAT: NL8038.48.341.B01
KVK: Rotterdam 24191182
VIHB: ZH509729VIHB

Disclaimer

© 2018 ERP Trading BV
Website by Djen Design.

Admin