Drilling rig Ocean Endeavor needed to be dry transported. Transport was done by the Dockwise Vanguard. The drilling rig will be loaded at Constantza using the float on method. Deck preparations for the Ocean Endeavor were done in Rotterdam on the Bouys (Prinses Arianehaven) 2nd Maasvlakte.

ERP Trading BV was invited to do:

  • Cleaning of old remnants previous project
  • Outfitting new cribbingplan for Ocean Endeavor 
  • Repositioningand welding of 3 guideposts