Commissioned by Gazpromneft-razite JSC STG-M, Bluewater transported the Arctic Loading Tower for the Noviy Port Terminal Siberia. Bluewater was using the transport vessel KOREX SPB No2. ERP Trading BV was awarded to clean the vessel at the port of Vlissingen after the discharge of the Artic Loading Tower. Time frame for the cleaning was 2 1/2 day (of 24 hours). The project covered 1200 meter of gouging work.